Skip to main content
Flowline Dress Short Sleeve Inkblot Floral Noir
Flowline Dress Short Sleeve Inkblot Floral Noir
Flowline Dress Short Sleeve Inkblot Floral Noir

Flowline Dress Short Sleeve Inkblot Floral Noir

$322.00
Tax included.

FREE EXPRESS SHIPPING OVER $250 NZD

SECURE PAYMENTS

EASY RETURNS

“Designed in New Zealand for real women living real lives.”

The Flowline Dress Inkblot Floral Noir 

Relaxed and effortless with a softly flowing A-line silhouette. Featuring clean architectural lines, inset pockets, and an easy drape that moves beautifully on the body. Finished with raw hems and a modern neckline detail for an understated yet elevated everyday feel. 
Designed in New Zealand for real women. 

Fabric Composition – Stretch Cotton

GARMENT MEASUREMENTS

Every style is different, so we provide actual garment measurements for each individual piece.

Please see the Garment Measurements image in the product photos for the measurements specific to this style.

These are measurements of the finished garment, not your body, and are designed to help you understand how the garment will fit.

 

Body Size Guide 

Shown below and can be used as a general guide when choosing your size.

Please note: all our models are wearing a size Small.

If you’re unsure or need extra guidance, we’re always happy to help - just email us at sales@jellicoe.co.nz.

Model Details

Kellie is 162cm tall and wears size small.
Leese is 173cm tall and wears size small.

Maddi is 174cm tall and wears size small.

Suzanna is 168cm tall and wears size small.



100% Stretch Cotton

CARE INSTRUCTIONS:
Cold handwash
Line dry or flat dry in shade
Do not soak/bleach/wring/tumble dry
Do not iron on print if it has one
Iron on inside
Designed in New Zealand

  • Free Express Shipping
    on all New Zealand orders over $200.00 (1-4 Days)
  • Orders under $200.00. Flat rate of $8.00 applies (1-4 Days)
  • International orders Flat rate: $25

Read Full Shipping Details

RETURNS

  • Full-priced items:
    return within 7 days for a refund or exchange.
  • Sale items: return to us within 7 days for an exchange or Store credit.
  • Items marked ‘Final Sale’: not eligible for refund or exchange.


Read Full Returns Details

Pairs well with